Details for the 2011 Ride

Next month’s ride is approaching quickly! Here are some additional details about the event:

The start and finish lines will be at Lafayette Community Park, 480 St. Mary’s Rd. (plenty of parking is available at the park). The park is conveniently located only 3.5 miles away from BART. Check-in is 7:00am – 9:00am. We urge century and slower riders to get an early start. Breakfast will be provided at the start, and rest stops will be stocked with refueling drinks and snacks. The course closes at 5:00pm. The event will conclude with a post-ride celebration meal at the park.

For the route: Starting in Lafayette, CA, the 50k will head North along the San Pablo Reservoir and skirt around the Eastern side of Briones Regional Park. The 100k will venture South into the foothills of Mt. Diablo before heading West through the canyon and coming back up Redwood. The century will combine both the 50k and 100k courses with an added climb into the Berkeley hills to round off the 100 miles.

View the map here: 2011 Ride

This entry was posted in News. Bookmark the permalink.

Comments are closed.